5 Pointz
Galli Engineering prepared and submitted Brownfield applications. To support applications it was necessary to complete a Phase 1 and Phase 11 environmental site assesment. GE was present at the site for remedial oversight, air monitoring, tracking of contaminated soil shipments, and end point sampling. A remedial work plan and final engineering report was done by Galli Engineering.